DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Dredge Jadwin Completes 2019 Season
Business & Finance

December 24, 2019 · about 6 years ago

Dredge Jadwin Completes 2019 Season

The U.S. Army Corps of Engineers Vicksburg District’s Dredge Jadwin has completed its 2019 season. During the 2019 season, the Jadwin dredged more than 4 million cubic yards of sand, mud and sediment from the lower Mississippi River to allow the waterway to remain navigable for commercial traffic. “

2 minutes read
  • LinkedIn
  • X
  • Email

The U.S. Army Corps of Engineers Vicksburg District’s Dredge Jadwin has completed its 2019 season.

During the 2019 season, the Jadwin dredged more than 4 million cubic yards of sand, mud and sediment from the lower Mississippi River to allow the waterway to remain navigable for commercial traffic.

“ Part of our mission as the Army Corps is to maintain navigation on our nation’s waterways, and here on the Mississippi River and its tributaries, dredging is one of the most important things that we do ,” said Vicksburg District Commander Col. Robert Hilliard . “ It’s been a tough season up and down the river, but the crew has done an outstanding job dredging, and I appreciate what they do out here each and every day. ”

Approximately 50 crew members are responsible for operating and maintaining the dredge. The dredging season typically occurs when water elevations are lower and spans from May to October or November.

Crew members live and work on board the dredge and its accompanying vessels throughout their deployment, which lasted more than 120 days this year.

One of three USACE dustpan dredges on the Mississippi River, the Jadwin uses a large suction head and high velocity water jets to loosen sand, mud and sediment from riverbeds, pumps that material through a floating pipeline and deposits it outside the navigation channel near the riverbank.

The Vicksburg District encompasses a 68,000-square-mile area across portions of Mississippi, Arkansas and Louisiana that holds seven major river basins and incorporates approximately 460 miles of mainline levees.

Channel maintenance and river stabilization insures that hundreds of billions of dollars of commerce flow freely up and down the Mississippi River and its tributaries.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & FinanceVessels

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1USACE starts feasibility study for Cooper River deepening
  2. 2BREAKING NEWS: Dutch Dredging takes delivery of new TSHD Magdalena
  3. 3Stockton closes boat launch due to dredging work
  4. 4E-touch Dredgers: Work on new TSHD progresses steadily

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free