Advertisement

Business & Finance

about 6 years ago

Repairing Muskegon South Breakwater Connector

Repairs to the Muskegon South Breakwater Connector in Muskegon, Michigan, are currently underway with the initial placement of armor stone on structure’s lakeside, the U.S. Army Corps of Engineers’ Detroit District reports. “Additional armor stone placement, demolition of the structure’s surface and

1 minutes read
Repairing Muskegon South Breakwater Connector
Image source: USACE

Repairs to the Muskegon South Breakwater Connector in Muskegon, Michigan, are currently underway with the initial placement of armor stone on structure’s lakeside, the U.S. Army Corps of Engineers’ Detroit District reports.

“Additional armor stone placement, demolition of the structure’s surface and placement of a new concrete cap will take place in the spring,” said USACE in their official announcement.

A contract for the work, in the amount of $1.6 million, was awarded to Muskegon’s Great Lakes Dock & Materials, LLC in September.

The repair work is on a portion of the breakwall that extends out to its elbow; the far end where the lighthouse stand is not under repair, according to MLive.

The southern breakwater is one of two in the area of the Muskegon Harbor. It extends 1,514 feet from the shore and Pere Marquette Park. The structure is also home to the Muskegon Breakwater Light.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Daily Dredging and Port Construction News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.