DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Abu Dhabi Ports Opts for BAM International
Business & Finance

February 10, 2020 · about 6 years ago

Abu Dhabi Ports Opts for BAM International

Abu Dhabi Ports announced today plans to design and construct a new cruise jetty at Sir Bani Yas Cruise Beach – the signature tourist destination located off the coast of Abu Dhabi. The €24.5 million new jetty project will be completed in Q4 2020, in time for the launch of the 2021 cruise season. Th

1 minutes read
  • LinkedIn
  • X
  • Email
Abu Dhabi Ports Opts for BAM International
Image source: BAM

Abu Dhabi Ports announced today plans to design and construct a new cruise jetty at Sir Bani Yas Cruise Beach – the signature tourist destination located off the coast of Abu Dhabi.

The €24.5 million new jetty project will be completed in Q4 2020, in time for the launch of the 2021 cruise season.

The expansion will allow two vessels to dock at any given time and provide up to 5,000 passengers with direct access to embark and disembark at an accelerated rate on the southeast beach of Sir Bani Yas Island.

Presently, cruise ships set anchor about one kilometer offshore from the island and visitors are ferried to and from the Cruise Beach via tender craft.

BAM International, the operating name for the Dutch construction company Royal BAM Group, outside of Europe, was selected to design and construct the new jetty.

The cruise jetty comprises an open-access trestle (350 meters length x 6 meters width) extending to a piled berth platform (105 meters length x 15 meters width), together with eight mooring dolphins, firefighting equipment, solar lighting, as well as a hand railing, with an option to construct ten beach-control structures (groynes).

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & Finance

Daily Dredging and Port Construction News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Heartland Fabrication invests big in hopper barge production
  2. 2Weymouth hosts public meeting on Back River dredging
  3. 3Port of Seattle: Terminal 91 dredging plan on display
  4. 4Sinocalan River dredging project on the way

Daily Dredging and Port Construction News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free