Business & Finance

about 6 years ago

Pool 6 Dredged Material Plan Available

The U.S. Army Corps of Engineers, St. Paul District, has released its draft Environmental Assessment (EA) for a proposed dredged material management plan in Pool 6, near Winona, Minnesota, and will accept comment on it through March 9. The draft plan outlines the transportation and land requirements

1 minutes read
Pool 6 Dredged Material Plan Available
Image source: USACE

The U.S. Army Corps of Engineers, St. Paul District, has released its draft Environmental Assessment (EA) for a proposed dredged material management plan in Pool 6, near Winona, Minnesota, and will accept comment on it through March 9.

The draft plan outlines the transportation and land requirements to permanently place dredged material removed from the Mississippi River in Pool 6 for the next 20 years.

Pool 6 is a 14.4-mile stretch of the river from Lock and Dam 5A, in Fountain City, Wisconsin, to Lock and Dam 6 in Trempealeau, Wisconsin.

Corps of Engineers officials will host a public meeting to discuss the draft plan and receive public comments.

The meeting will take place at the Winona Historical Society, 160 Johnson St., in Winona, from 6 – 8 p.m., February 11.

The meeting will include a formal presentation highlighting the Corps’ navigation mission and the proposed dredged material management plan. A question and answer session will follow the presentation, said USACE.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Daily Dredging and Port Construction News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.