DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Comments Sought for Bal Harbour Beach Renourishment
Business & Finance

April 5, 2020 · about 6 years ago

Comments Sought for Bal Harbour Beach Renourishment

The U.S. Army Corps of Engineers, Jacksonville District has opened public comment on the Draft Environmental Assessment (EA) and proposed Finding of No Significant Impact (FONSI) regarding potential sand sources for the renourishment of the Bal Harbour Beach segment of the Dade County Beach Erosion

2 minutes read
  • LinkedIn
  • X
  • Email
Comments Sought for Bal Harbour Beach Renourishment
Image source: USACE

The U.S. Army Corps of Engineers, Jacksonville District has opened public comment on the Draft Environmental Assessment (EA) and proposed Finding of No Significant Impact (FONSI) regarding potential sand sources for the renourishment of the Bal Harbour Beach segment of the Dade County Beach Erosion Control and Hurricane Protection Project.

The Draft EA evaluates the use of additional sand sources for renourishment of Bal Harbour Beach, including dredged material from the Bakers Haulover Inlet (BHI) Channel and the Bakers Haulover Inlet Flood Shoal located between the federal channel of the Intracoastal Waterway and the Bakers Haulover Inlet Channel.

Potential borrow area alternatives for the Bal Harbour Beach renourishment evaluated in previous EAs/FONSIs, identified as “existing sources,” include the Intracoastal Waterway Cut DA-9, the Bakers Haulover Inlet Ebb Shoal offshore in the Atlantic Ocean, and upland sand mines, including the Ortona and Witherspoon mines in Glades County.

The potential for beneficial use of dredged material from the Bakers Haulover Inlet Channel and Bakers Haulover Inlet Flood Shoal, as well upland beach-quality sand will provide the Corps with additional options and flexibility, which is expected to reduce the overall cost of the beach renourishment project.

In addition, the Bakers Haulover Inlet Channel is in need of maintenance dredging to provide safe and efficient travel for navigation interests.

The proposed project would renourish Bal Harbour Beach from the south jetty of Bakers Haulover Inlet south for 0.85 mile. The renourishment would help manage coastal storm risk and beach erosion and help provide hurricane surge protection.

Public comments will be accepted through May 4, 2020.

More Info

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1USACE starts feasibility study for Cooper River deepening
  2. 2BREAKING NEWS: Dutch Dredging takes delivery of new TSHD Magdalena
  3. 3Stockton closes boat launch due to dredging work
  4. 4E-touch Dredgers: Work on new TSHD progresses steadily

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free