DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Final Report for Sacramento River Bank Protection Project
Business & Finance

April 13, 2020 · about 6 years ago

Final Report for Sacramento River Bank Protection Project

The U.S. Army Corps of Engineers Sacramento District has published the final post authorization change report as well as the final environmental impact statement/environmental impact report for the Sacramento River Bank Protection Project. The reports analyze modifications to the long-term project,

1 minutes read
  • LinkedIn
  • X
  • Email
Final Report for Sacramento River Bank Protection Project

The U.S. Army Corps of Engineers Sacramento District has published the final post authorization change report as well as the final environmental impact statement/environmental impact report for the Sacramento River Bank Protection Project.

The reports analyze modifications to the long-term project, which identifies, prioritizes, and repairs erosion-related levee deficiencies within the Sacramento River Flood Control Project.

The SRFCP is located along the Sacramento River from Elk Creek, near Tehama, to its confluence with the San Joaquin River in the Sacramento-San Joaquin Delta.

The PACR sets a revised framework for the implementation of 80,000 linear feet of repairs originally authorized as part of Phase II, while the EIS-EIR identifies potential impacts and mitigation associated with the proposed action.

A 30-day public review period of the documents will run from April 10 to May 11, 2020.

The documents can be found on the Sacramento District web site’s Sacramento River Bank Protection Project web page .

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & Finance

Daily Dredging and Port Construction News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Boskalis, Van Oord gear up for Sweden's largest-ever dredging project
  2. 2USACE modernizes national dredging delivery through enterprise execution
  3. 3Dredging plan for Cedar River Harbor on the table
  4. 4BREAKING NEWS: Keyfield takes delivery of TSHD Inai Kenanga

Daily Dredging and Port Construction News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free