DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Authorities & Government›J.E. McAmis to dredge Columbia River
Authorities & Government

June 4, 2020 · about 6 years ago

J.E. McAmis to dredge Columbia River

The Oregon Department of Environmental Quality (DEQ) has received application for 401 Water Quality Certification for dredging in Lower Columbia River. As DEQ reported, J.E. McAmis, Inc. has applied for a U.S. Army Corps of Engineers 404 Permit for dredging activities in the lower Columbia River. Th

1 minutes read
  • LinkedIn
  • X
  • Email
J.E. McAmis to dredge Columbia River
Image source: J.E. McAmis

The Oregon Department of Environmental Quality (DEQ) has received application for 401 Water Quality Certification for dredging in Lower Columbia River.

As DEQ reported, J.E. McAmis, Inc. has applied for a U.S. Army Corps of Engineers 404 Permit for dredging activities in the lower Columbia River.

This action requires individual 401 water quality certifications from both the State of Washington Department of Ecology and the State of Oregon Department of Environmental Quality.

J.E. McAmis is proposing to remove up to 500,000 cubic yards from the federal navigation channel over a 10-year permit cycle, with an average removal volume of 50,000 cubic yards per year.

Dredging will be performed using a clamshell bucket suspended by a floating derrick.

The purpose of this project is to obtain clean sand suitable for environmental capping and restoration by removing shoaling areas of excess sediment, which will assist the Corps with maintenance dredging in the specified reaches to maintain the permitted depth of -43 feet Columbia River Datum.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Authorities & GovernmentRegulation & policy

Daily Dredging and Port Construction News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Dredging plan for Cedar River Harbor on the table
  2. 2BREAKING NEWS: Keyfield takes delivery of TSHD Inai Kenanga
  3. 3Work progresses on Grand Isle breakwaters
  4. 4Pilbara Ports: Port of Dampier dredging set for November

Daily Dredging and Port Construction News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free