News

about 6 years ago

Lorain Harbor breakwater work progresses

The repairs works on the Lorain Harbor breakwater, conducted by Great Lakes Dock and Materials, LLC, are going strong. The breakwater is the first line of defense for lake-front communities against the powerful Great Lakes, said the U.S. Army Corps of Engineers, Buffalo District, in their latest rel

1 minutes read
Lorain Harbor breakwater work progresses
USACE

The repairs works on the Lorain Harbor breakwater, conducted by Great Lakes Dock and Materials, LLC, are going strong.

The breakwater is the first line of defense for lake-front communities against the powerful Great Lakes, said the U.S. Army Corps of Engineers, Buffalo District, in their latest release.

Under the repair plan, the contractor will complete the 2017 cell repair, consisting of a 50 linear foot void with a stone base and vertical sheet pile on top.

The $2.1 million contract was awarded to Great Lakes Dock and Materials, LLC back in September. The repairs are anticipated for completion by the end of the 2020 construction season.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Daily Dredging and Port Construction News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.