DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Infrastructure›New lease of life for Sand Bypass System
Infrastructure

June 18, 2020 · about 6 years ago

New lease of life for Sand Bypass System

The Gold Coast’s Sand Bypass System is about to receive a new lease of life with work underway on upgrading its high voltage switch gear. “We’ll invest about $1.9 million in upgrade works over the next 12 months,” said Gold Coast Waterways Authority in their latest release. The upgrade is expected t

2 minutes read
  • LinkedIn
  • X
  • Email
New lease of life for Sand Bypass System
gcwa.qld.gov.au

The Gold Coast’s Sand Bypass System is about to receive a new lease of life with work underway on upgrading its high voltage switch gear.

“We’ll invest about $1.9 million in upgrade works over the next 12 months,” said Gold Coast Waterways Authority in their latest release.

The upgrade is expected to generate about 20 direct and indirect jobs over the life of the project.

Their CEO, Hal Morris , said that GCWA has awarded a contract to engineering firm Cardno (QLD) to undertake design and procurement works and to oversee the installation of the upgrade.

“The Sand Bypass System has been reliably pumping sand north and helping keep the Seaway open for boaties for more than 30 years, relying on the same high voltage switching gear installed back in the late 1980s,” he said.

“It’s done a great job but it’s reaching the end of its natural life so it’s time for us to upgrade it in line with modern operational and safety standards.”

The Sand Bypass System is designed to transport 500,000 cubic metres of sand from The Spit to South Stradbroke Island each year. Ongoing improvements saw it pump more than 664,000 cubic metres along the coastline last financial year.

Mr Morris said that the upgrade builds on other investments in improving the operating efficiency of the system including a project to strengthen the jetty decking which is nearing completion and the installation of a solar array which is producing enough energy to help meet the day-time needs of the Sand Bypass System.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Infrastructure

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1USACE starts feasibility study for Cooper River deepening
  2. 2BREAKING NEWS: Dutch Dredging takes delivery of new TSHD Magdalena
  3. 3Stockton closes boat launch due to dredging work
  4. 4E-touch Dredgers: Work on new TSHD progresses steadily

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free