Infrastructure

about 6 years ago

Port of Blyth dredging begins

A Port of Blyth maintenance dredging project is set to begin on July 4, the port said in their latest release. This maintenance dredging scheme will be conducted at the port approaches, main navigational channel and operational commercial berths. The Port of Blyth dredging work will include frequen

1 minutes read
Port of Blyth dredging begins
ukdredging.co.uk

A Port of Blyth maintenance dredging project is set to begin on July 4, the port said in their latest release.

This maintenance dredging scheme will be conducted at the port approaches, main navigational channel and operational commercial berths.

The Port of Blyth dredging work will include frequent trips to and from the spoil deposit ground approximately 3 miles ENE of the harbor East Pier and south bound past the wind turbine array.

Under this latest maintenance dredging program, the operations are going to be conducted over a 24 hour period by the trailing suction hopper dredger (TSHD) UKD Marlin and the tug/plough vessel Blyth Endeavour.

According to UK Dredging (UKD), the TSHD’s owner, the modern dredger designed for use in open sea and estuarial locations, UKD Marlin has the ability and maneuverability to dredge in confined locations such as enclosed docks.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Daily Dredging and Port Construction News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.