DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Infrastructure›First breach closed on L-536 levee system
Infrastructure

July 13, 2020 · about 6 years ago

First breach closed on L-536 levee system

The U.S. Army Corps of Engineers, Omaha District closed the first breach along the L-536 levee system Thursday. The “F” breach on the Missouri River Levee System L-536 near River Mile 520 was closed to the 5-yr level of protection, reported the Corps. Typically breach closures are not reported until

2 minutes read
  • LinkedIn
  • X
  • Email
First breach closed on L-536 levee system
USACE

The U.S. Army Corps of Engineers, Omaha District closed the first breach along the L-536 levee system Thursday.

The “F” breach on the Missouri River Levee System L-536 near River Mile 520 was closed to the 5-yr level of protection, reported the Corps.

Typically breach closures are not reported until they reach the 10-yr level of protection, but the repairs at this location were only to cut-off flows to allow for follow-on construction activities.

According to USACE, the current plan is to set the levee back at this location, so no further repairs are scheduled for this breach location at this time.

The contract to repair the L-536 levee system was awarded to AECOM Technical Services, Inc. of Los Angeles, California, in mid-May.

There are four remaining breaches on the L-536 levee system and the team is currently working to close two of those breaches.

These are the only four remaining breaches on levee systems active within the PL 84-99 Program within the Omaha District’s area of responsibility.

“The first breach closure along the L536 Levee System is a major milestone in repairing the flood risk management infrastructure damaged by last year’s historical flooding,” said Brent Cossette , Omaha District Project Manager for the L-536 Levee Repair project.

There are more than 350 miles of levees on the Missouri, Platte and Elkhorn rivers, and tributaries that experienced significant flood damage since March 2019. Due to the magnitude of damage along these levees, repair efforts will take an extended period of time to complete.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Infrastructure

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1USACE starts feasibility study for Cooper River deepening
  2. 2BREAKING NEWS: Dutch Dredging takes delivery of new TSHD Magdalena
  3. 3Stockton closes boat launch due to dredging work
  4. 4E-touch Dredgers: Work on new TSHD progresses steadily

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free