Advertisement

Infrastructure

about 6 years ago

Grand Isle bayside breakwaters complete

The Louisiana Coastal Protection and Restoration Authority (CPRA) announced recently the completion of the Grand Isle Bayside Breakwaters project. According to CPRA, the project will close a large gap in the protective breakwater alignment on the bayside of Grand Isle. During construction, workers i

1 minutes read
Grand Isle bayside breakwaters complete
CPRA

The Louisiana Coastal Protection and Restoration Authority (CPRA) announced recently the completion of the Grand Isle Bayside Breakwaters project.

According to CPRA, the project will close a large gap in the protective breakwater alignment on the bayside of Grand Isle.

During construction, workers installed thousands of yards of a permeable geotextile fabric as the base to hold 62,426 tons of rock riprap.

The 17 new rock breakwaters now form 17 350-foot-long structure that completes the existing chain of bayside breakwaters and provides protection to the back side of the island.

The whole project, estimated at $6.5 million, was fully funded by the CPRA.

The Grand Isle Independent Levee District managed the construction of the breakwater alignment along a one-mile stretch.

Advertisement

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Daily Dredging and Port Construction News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.