DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Infrastructure›St. George Harbor project step closer to launch
Infrastructure

August 31, 2020 · about 6 years ago

St. George Harbor project step closer to launch

Lt. Gen. Todd T. Semonite, commanding general of the U.S. Army Corps of Engineers recently signed the St. George Harbor Improvement Chief’s Report. The signing progresses the proposed project to Congress for authorization. Located on the northeast shore of St. George Island, the proposed project aim

1 minutes read
  • LinkedIn
  • X
  • Email
St. George Harbor project step closer to launch
USACE

Lt. Gen. Todd T. Semonite, commanding general of the U.S. Army Corps of Engineers recently signed the St. George Harbor Improvement Chief’s Report.

The signing progresses the proposed project to Congress for authorization.

Located on the northeast shore of St. George Island, the proposed project aims to increase the safe accessibility of marine navigation to the community of St. George, Alaska.

“Currently, the unsafe conditions near the harbor directly impacts the cost of living at St. George,” said Col. David Hibner , acting commander of the U.S. Army Corps of Engineers – Alaska District.

The final feasibility study recommends the dredging of a 450-foot wide by 550-foot long mooring basin to -20 feet.

The basin will be protected by a 1,731-foot long north breakwater and a 250-foot long spur breakwater at its west edge.

The basin connects to the Bering Sea with a 250-foot wide navigation channel dredged to -25 feet.

Dredging the channel and basin requires the removal of about 353,000 cubic yards of material.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Infrastructure

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1USACE starts feasibility study for Cooper River deepening
  2. 2BREAKING NEWS: Dutch Dredging takes delivery of new TSHD Magdalena
  3. 3Stockton closes boat launch due to dredging work
  4. 4E-touch Dredgers: Work on new TSHD progresses steadily

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free