Advertisement

Equipment

about 6 years ago

Dragflow DRP Series busy in Germany

A sediment removal scheme on the Wehra reservoir, located deep in the German Black Forest, is currently underway. The facility, built in 1977, serves as a storage facility for a cavern power station. Additionally, in the course of extensive remedial measures, the lake has to be cleared of sediments.

1 minutes read
Dragflow DRP Series busy in Germany
Dragflow

A sediment removal scheme on the Wehra reservoir, located deep in the German Black Forest, is currently underway.

The facility, built in 1977, serves as a storage facility for a cavern power station. Additionally, in the course of extensive remedial measures, the lake has to be cleared of sediments.

For this project, a Dragflow’s radio-controlled dredges – DRP Series is being used.

From November 2020 to March 2021, sediments will be pumped over a distance of 2 km across the lake. Also, the material will then be filtered and collected in geotextile bags.

Finally, the DRP Series Dredge will work fully automatically, unmanned, 24-hour operation with a GPS and Echosounder.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Daily Dredging and Port Construction News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.