DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Infrastructure›Port of Lucky Bay dredging wraps up
Infrastructure

December 29, 2020 · about 5 years ago

Port of Lucky Bay dredging wraps up

The Port of Lucky Bay, South Australia, has a specific purpose: it has ample storage for locally grown grains. This grain is exported; its export vessels wait offshore. A number of small feeder vessels ensure the connecting transport. They load their cargo in the 2-berth shallow water port, to disch

1 minutes read
  • LinkedIn
  • X
  • Email
Port of Lucky Bay dredging wraps up
Damen

The Port of Lucky Bay, South Australia, has a specific purpose: it has ample storage for locally grown grains. This grain is exported; its export vessels wait offshore.

A number of small feeder vessels ensure the connecting transport. They load their cargo in the 2-berth shallow water port, to discharge into the large export vessels.

These activities require excellent access to the port, which has been created relatively recently.

Yet the harbor access was more and more hindered by sand built up due to natural sediment disposal. To remove these sand banks, Polaris Marine Pty employed a DOP250 with cutter head.

The DOP was mounted onto a 336 CAT crane boom, and the unit was placed on a pontoon for easy maneuverability. The DOP dredge pump removed all shallow draft sand.

With the top layer of sediment gone, a trailing suction hopper dredgers had access to the port again for further maintenance dredging.

The DOP250-set up completed the job in lass than 4 months.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Infrastructure

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1USACE starts feasibility study for Cooper River deepening
  2. 2BREAKING NEWS: Dutch Dredging takes delivery of new TSHD Magdalena
  3. 3Stockton closes boat launch due to dredging work
  4. 4E-touch Dredgers: Work on new TSHD progresses steadily

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free