DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›$40.8M for marsh creation project in Plaquemines Parish (LA)
Business & Finance

February 4, 2021 · about 5 years ago

$40.8M for marsh creation project in Plaquemines Parish (LA)

Plaquemines Parish officials have announced another coastal restoration project award from Coastal Wetlands Planning, Protection and Restoration Act (CWPPRA). The project is located in Breton Sound Basin, Plaquemines Parish, west of Delacroix along Bayou Gentilly in Louisiana. “Allocating these fund

2 minutes read
  • LinkedIn
  • X
  • Email
$40.8M for marsh creation project in Plaquemines Parish (LA)
CPRA

Plaquemines Parish officials have announced another coastal restoration project award from Coastal Wetlands Planning, Protection and Restoration Act (CWPPRA).

The project is located in Breton Sound Basin, Plaquemines Parish, west of Delacroix along Bayou Gentilly in Louisiana.

“Allocating these funds to projects in our parish means big steps are being taken toward bringing projects to reality. Marsh creation is key. Overall, marshes provide vital habitat for hundreds of thousands of birds and nursery habitat for a variety of fish and shellfish crucial to Plaquemines Parish’s fishing industry,” said Plaquemines Parish President Kirk Lepine .

The goal of this project is to create and nourish approximately 514 acres of intertidal marsh with material dredged from Lake Lery.

This will create approximately 22,000 LF of terraces (17 acres of marsh) in strategic areas to reduce erosion due to wind-induced waves and trap sediments from the Caernarvon Freshwater Diversion that pass-through Lake Lery and into Lost Lake.

From 1932 to 1990, the Caernarvon Mapping Unit lost 14,240 acres of its marsh. Before Hurricane Katrina, the greatest loss documented occurred between 1956 and 1974 and coincided with Hurricane Betsy and extensive canal building.

Hurricane Katrina in 2005 devastated the area resulting in substantial marsh loss. According to United States Geological Survey (USGS), approximately 39 square miles of marsh around the upper and central portions of Breton Sound were converted to open water by ripping of the marsh or by marsh submergence.

Based on the hyper-temporal analysis conducted by USGS for the extended project boundary, the loss rate in the project area is estimated to be –1.91 % a year from 1984 to 2019.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & Finance

Daily Dredging and Port Construction News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1PHOTO OF THE DAY: Swiss Army Knife of Great Lakes in Ashtabula
  2. 2Puerto de Sevilla completes Guadalquivir dredging
  3. 3McLaughlin & Harvey appointed to Dover' Project Contractor Framework
  4. 4Oceanside Harbor dredging wraps up

Daily Dredging and Port Construction News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free