DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Infrastructure›Cameron Meadows Marsh Creation project kicks off
Infrastructure

February 4, 2021 · about 5 years ago

Cameron Meadows Marsh Creation project kicks off

Construction activity is underway on the Cameron Meadows Marsh Creation and Terracing project located in Cameron Parish, northwest of Holly Beach, the Louisiana Coastal Protection and Restoration Authority (CPRA) informs. This restoration project will address a large area of marsh that has degraded

1 minutes read
  • LinkedIn
  • X
  • Email
Cameron Meadows Marsh Creation project kicks off
CPRA

Construction activity is underway on the Cameron Meadows Marsh Creation and Terracing project located in Cameron Parish, northwest of Holly Beach, the Louisiana Coastal Protection and Restoration Authority (CPRA) informs.

This restoration project will address a large area of marsh that has degraded into open water due to subsidence, saltwater surge from Hurricane Rita and other storms, excessive drought, and salt water retention as a result of silted-in canals which prohibited adequate drainage.

According to CPRA, containment dikes are currently being constructed to hold approximately 2.36 million cubic yards of sand dredged from the Gulf of Mexico and pumped five miles inland to build more than 308 acres of marsh.

An additional 11 acres will be added with the construction of 2.8 miles of terrace structures which will reduce wave erosion and allow sediment deposition for land building.

Additionally, several water control structures and protection measures will reduce saltwater intrusion on adjacent properties.

The $32 million project is funded by the Coastal Wetlands Planning, Protection and Restoration Act (CWPPRA) and is a joint effort by CPRA and the federal sponsor, the National Oceanic and Atmospheric Administration (NOAA).

Great Lakes Dredge and Dock was awarded the competitively-bid contract for construction, which is expected to be complete by the end of this year.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Infrastructure

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1USACE starts feasibility study for Cooper River deepening
  2. 2BREAKING NEWS: Dutch Dredging takes delivery of new TSHD Magdalena
  3. 3Stockton closes boat launch due to dredging work
  4. 4E-touch Dredgers: Work on new TSHD progresses steadily

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free