DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Infrastructure›Peel Marina dredging resumes
Infrastructure

February 10, 2021 · about 5 years ago

Peel Marina dredging resumes

A dredging operation to remove 44,000 tonnes of silt from Peel Marina will resume in late February, following the return to work of the construction sector, Isle of Man Government reports. Following on from last year’s dredging works, the dredging process will again involve using a long reach excava

1 minutes read
  • LinkedIn
  • X
  • Email
Peel Marina dredging resumes
Rob Callister, MHK – Member for Onchan facebook

A dredging operation to remove 44,000 tonnes of silt from Peel Marina will resume in late February, following the return to work of the construction sector, Isle of Man Government reports.

Following on from last year’s dredging works, the dredging process will again involve using a long reach excavator on a floating barge, with the material transported 450 meters in purpose-designed trailers to a temporary drainage pool constructed in a field upstream from the Marina, beyond the power station site.

Moving the material involves two tractors and trailers undertaking a total of 30 return journeys a day during the dredging works, running 7am to 7pm every day. 16,000 tonnes of silt was removed from the marina during 2020, the statement reads.

Commenting the latest news, Minister for Infrastructure, Tim Baker MHK , said: “I’m pleased that this work is now able to resume, after the challenges of our recent COVID-19 circuit break. I want to thank the team for their hard work and look forward to the completion of this project. This series of planned works marks the end of our main dredging project, requiring only annual or bi-annual maintenance in the years to come.”

To ensure the safety of the public, a road closure order has been put in place to cover the path the trailers will take from the boat yard on East Quay to the former steam railway line heritage trail.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Infrastructure

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1USACE starts feasibility study for Cooper River deepening
  2. 2BREAKING NEWS: Dutch Dredging takes delivery of new TSHD Magdalena
  3. 3Stockton closes boat launch due to dredging work
  4. 4E-touch Dredgers: Work on new TSHD progresses steadily

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free