DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Equipment›Van der Leun’s electrical installation for WID Osprey
Equipment

February 22, 2021 · about 5 years ago

Van der Leun’s electrical installation for WID Osprey

Van der Leun America has successfully installed the electrical installation on the water injection dredger (WID) Osprey. The dredger, built by St. Johns Ship Building in Palatka, Florida, for IHC America, will be operating in Wilmington, North Carolina. Earlier this month, IHC America delivered and

1 minutes read
  • LinkedIn
  • X
  • Email
Van der Leun’s electrical installation for WID Osprey
Van der Leun

Van der Leun America has successfully installed the electrical installation on the water injection dredger (WID) Osprey.

The dredger , built by St. Johns Ship Building in Palatka, Florida, for IHC America, will be operating in Wilmington, North Carolina.

Earlier this month, IHC America delivered and commissioned the Osprey to the North Carolina State Ports Authority (NCSPA).

The WID will support the main seaports of Wilmington and Morehead City with maintaining the depths at all berths, wharves and turning basins year- round, which will maximize the vessel tonnage capabilities at these ports.

The Osprey is designed to move sediment utilizing hydrodynamic principles at low cost from the various dredged areas and allowing the natural currents in the channel to move the sediment from these areas, while keeping the material within the Cape Fear River system.

The dredger is designed to be low in maintenance and ease of operation per NCSPA requirements.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Equipment

Daily Dredging and Port Construction News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1All set for Nairn Harbor dredging project
  2. 2DMYLES gears up for Cleveland Harbor dredging
  3. 3Dredging underway at Nipper Park marina
  4. 4TSHD Costa Atlantica begins Port Santo dredging job

Daily Dredging and Port Construction News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free