DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Operations & Maintenance›Record of decision signed for Mississippi River mainline levees SEIS II
Operations & Maintenance

March 14, 2021 · about 5 years ago

Record of decision signed for Mississippi River mainline levees SEIS II

The U.S. Army Corps of Engineers (USACE) has signed the Record of Decision for the Mississippi River mainline levees Final Supplemental Environmental Impact Statement II. The Record of Decision details USACE’s decisions on conducting remedial measures necessary to control seepage and/or raise and st

1 minutes read
  • LinkedIn
  • X
  • Email
Record of decision signed for Mississippi River mainline levees SEIS II
USACE

The U.S. Army Corps of Engineers (USACE) has signed the Record of Decision for the Mississippi River mainline levees Final Supplemental Environmental Impact Statement II.

The Record of Decision details USACE’s decisions on conducting remedial measures necessary to control seepage and/or raise and stabilize deficient sections of the existing levees and floodwalls to protect the structural integrity and stability of the MRL system, as well as measures to avoid and minimize adverse impacts and compensate for unavoidable losses to significant environmental resources.

Through evaluation of information and data obtained from levee inspections, seepage analyses, research, studies and engineering assessments, the USACE Memphis, Vicksburg and New Orleans districts collectively identified a total of 143 additional Work Items along various reaches of the Mississippi River mainline levees (MRL) feature of the MR&T project.

These 143 Work Items constitute the proposed action for the Final SEIS II and are located across portions of seven states: Illinois, Missouri, Kentucky, Tennessee, Arkansas, Mississippi and Louisiana.

The Final SEIS II supplements and, as necessary, augments the 1976 FEIS and 1998 Supplemental EIS (SEIS I) to achieve USACE’s primary goals for the MR&T: (1) providing flood risk management from the Project Design Flood; and (2) being an environmentally sustainable project.

The Record of Decision was signed by Maj. Gen. Diana Holland, Commanding General, USACE Mississippi Valley Division.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Operations & Maintenance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1USACE starts feasibility study for Cooper River deepening
  2. 2BREAKING NEWS: Dutch Dredging takes delivery of new TSHD Magdalena
  3. 3Stockton closes boat launch due to dredging work
  4. 4E-touch Dredgers: Work on new TSHD progresses steadily

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free