DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Infrastructure›North Portsea Island scheme moving forward
Infrastructure

March 17, 2021 · about 5 years ago

North Portsea Island scheme moving forward

Coastal Partners today released the latest update on their North Portsea Island Coastal Defense Project. From April to September 2021, they will be constructing the first 500m of seawall and rebuilding two slipways along the Eastern Road as part of the North Portsea Island coastal defense scheme. “W

1 minutes read
  • LinkedIn
  • X
  • Email
North Portsea Island scheme moving forward
Coastal Partners

Coastal Partners today released the latest update on their North Portsea Island Coastal Defense Project.

From April to September 2021, they will be constructing the first 500m of seawall and rebuilding two slipways along the Eastern Road as part of the North Portsea Island coastal defense scheme.

“We will also be preparing the area of the next 1km of frontage ready for construction in 2022. The coastal path will be closed with a diversion for pedestrians in place,” the statement reads.

The North Portsea Island Scheme covers 8.4km of Portsmouth’s coastline from Tipner through to Milton.

Most of the area is low-lying and many of the current coastal defenses are approaching the end of their effective lives. Predictions also indicate that sea levels are set to rise by up to a meter over the next 100 years, meaning the flood risk to the area will increase.

The new scheme is designed to a 1 in 500 year (plus allowance for climate change to 2100) standard of protection against flooding, reducing the risk of flooding from the sea to over 4,200 homes, 500 businesses, and critical infrastructure including the Eastern Road over the next 100 years.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Infrastructure

Daily Dredging and Port Construction News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Skanska builds new homeport pier at Naval Station Newport
  2. 2Ecocoast, Xylem partnership strengthens turbidity monitoring for GCC dredging projects
  3. 3Seaward Marine wins $15.2M Virginia Beach contract
  4. 4BREAKING NEWS: Renewed Afsluitdijk opens, Van Oord says

Daily Dredging and Port Construction News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free