DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Equipment›Wabtec marine engines for largest U.S. hopper dredger
Equipment

April 13, 2021 · about 5 years ago

Wabtec marine engines for largest U.S. hopper dredger

Wabtec Corporation and U.S. Channel Partner, Cummins Sales & Service, recently signed a contract to supply the main power for the largest U.S. flagged, self-propelled trailing suction hopper dredge, Frederick Paup. Wabtec will deliver five V250MDC marine diesel engines (three 16V250MDC units and two

1 minutes read
  • LinkedIn
  • X
  • Email
Wabtec marine engines for largest U.S. hopper dredger
Manson Construction

Wabtec Corporation and U.S. Channel Partner, Cummins Sales & Service, recently signed a contract to supply the main power for the largest U.S. flagged, self-propelled trailing suction hopper dredge, Frederick Paup.

Wabtec will deliver five V250MDC marine diesel engines (three 16V250MDC units and two 12V250MDC units). The Frederick Paup will be owned and operated by Manson Construction Co. and built at the Keppel AmFELS Shipyard in Brownsville, Texas.

The Wabtec V250 series diesel engines will be manufactured at Wabtec’s Grove City, Pennsylvania plant. These advanced engines reduce air pollutant emissions by up to 70 percent, through technologies such as high-pressure common rail fuel injection, two-stage turbocharging with inter- and aftercooling, advanced exhaust gas recirculation, and an upgraded control system.

The engines meet the stringent EPA Tier 4 and the IMO Tier III emissions standards without the need for urea aftertreatment. Wabtec’s design requires up to 50% less weight and up to 40% less of valuable shipboard space, provides significant operating cost savings, and reduces operational hazards and cost associated with handling aftertreatment chemicals such as urea.

Scheduled for commissioning in 2022 and operations in 2023, the 15,000 cubic yard Frederick Paup has a length of 420-ft, breadth of 81-ft and draft of 28.5-ft.

The U.S. built, U.S. flagged, and U.S. crewed vessel will support the U.S. Army Corps of Engineers’ mission by keeping the marine transportation highway open throughout the United States.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

EquipmentVessels

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1USACE starts feasibility study for Cooper River deepening
  2. 2BREAKING NEWS: Dutch Dredging takes delivery of new TSHD Magdalena
  3. 3Stockton closes boat launch due to dredging work
  4. 4E-touch Dredgers: Work on new TSHD progresses steadily

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free