DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Environment›DO injection system tests released
Environment

May 4, 2021 · about 5 years ago

DO injection system tests released

The U.S. Army Corps of Engineers, Savannah District has released results of tests of the dissolved oxygen (DO) injection system for the Savannah harbor deepening project. According to the Corps, the tests of the DO injection system prove that the multi-million-dollar apparatus successfully mitigates

2 minutes read
  • LinkedIn
  • X
  • Email
DO injection system tests released
USACE

The U.S. Army Corps of Engineers, Savannah District has released results of tests of the dissolved oxygen (DO) injection system for the Savannah harbor deepening project.

According to the Corps, the tests of the DO injection system prove that the multi-million-dollar apparatus successfully mitigates for the reduction in DO in the Savannah River due to the current deepening project.

USACE Savannah District office stated the two-location system can place the required average of 40,000 pounds a day of pure oxygen into the river, according to a recently published report . The pure oxygen dissolves completely in raw river water, and then gets discharged back into the bottom of the river. Diffusers deep under the surface ensure the super-oxygenated water mixes well horizontally and vertically, with virtually no oxygen lost from the water surface into the atmosphere.

The DO injection systems will operate during the hot summer months of June through September when dissolved oxygen in the river naturally weakens. The added DO will mitigate for impacts on the DO levels from the deepening project.

The Savannah Harbor Expansion Project, known as SHEP, will deepen the harbor from 42 feet deep to 47 feet deep at average low water levels. This will allow expanded use of the harbor by modern, larger container vessels and allow those ships to enter and exit the harbor for a longer time during each tidal cycle. This expansion will lower transportation costs to the nation while increasing shipping capacity. The SHEP is scheduled for completion in 2022.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Environment

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1USACE starts feasibility study for Cooper River deepening
  2. 2BREAKING NEWS: Dutch Dredging takes delivery of new TSHD Magdalena
  3. 3Stockton closes boat launch due to dredging work
  4. 4E-touch Dredgers: Work on new TSHD progresses steadily

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free