DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Infrastructure›O‘ahu seawall repair project kicks off
Infrastructure

June 9, 2021 · about 5 years ago

O‘ahu seawall repair project kicks off

A popular walkway along a scenic portion of O‘ahu’s south shore will be repaired and reinforced as part of a project beginning this week, the City and County of Honolulu said. Approximately 500 feet of seawall located along the promenade between the Waikīkī Aquarium and Barefoot Beach Café food conc

1 minutes read
  • LinkedIn
  • X
  • Email
O‘ahu seawall repair project kicks off
Kiewit

A popular walkway along a scenic portion of O‘ahu’s south shore will be repaired and reinforced as part of a project beginning this week, the City and County of Honolulu said.

Approximately 500 feet of seawall located along the promenade between the Waikīkī Aquarium and Barefoot Beach Café food concession is severely eroded after years of direct exposure to ocean conditions and southern swells.

According to the city, this project aims to reconstruct a large portion of the lower area of the promenade, while installing concrete anchors and mats to stabilize and protect these features.

The $1.9 million construction scheme, awarded to Kiewit Infrastructure, is expected to be completed before the end of 2021.

Last January, in-house Department of Parks and Recreation crews repaired a damaged concrete wall, removed the eroded ramp, and added new curbing to the seawall just ‘Ewa of the current project site.

“These projects highlight the continuing impact sea level rise is having on our coastal resources, with a half-foot rise in the ocean level measured around O‘ahu over the last 100 years and more than 3 feet of rise projected through this century. Projects like these serve as a reminder of the need for contextual planning and projects to address sea level rise and coastal erosion island wide,” the city said.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Infrastructure

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1USACE starts feasibility study for Cooper River deepening
  2. 2BREAKING NEWS: Dutch Dredging takes delivery of new TSHD Magdalena
  3. 3Stockton closes boat launch due to dredging work
  4. 4E-touch Dredgers: Work on new TSHD progresses steadily

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free