Equipment

about 5 years ago

Callan announces construction of CSD General Marshall

Callan Marine has announced the construction of its newest dredge, an 18” cutter suction dredge (CSD) named The General Marshall. The General Marshall will join Callan’s fleet in 2022. At 194 feet in length and 41 feet wide, the General Marshall will have a maximum digging depth of 60 feet, a dredge

1 minutes read
Callan announces construction of CSD General Marshall
Callan

Callan Marine has announced the construction of its newest dredge, an 18” cutter suction dredge (CSD) named The General Marshall.

The General Marshall will join Callan’s fleet in 2022.

At 194 feet in length and 41 feet wide, the General Marshall will have a maximum digging depth of 60 feet, a dredge pipe diameter of 18 inches, and a 300 horsepower cutter.

Manufactured by DSC Dredge in Reserve, Louisiana, it will boast an overall horsepower of 3,005hp.

“Our cutter suction dredge fleet continues to grow in order to meet the demands of the coastal market,” stated Maxie McGuire , President of Callan Marine.

“The General Marshall will add increased capabilities and response for maintenance and improvement dredging, allowing us to serve more clients in the public and private sector.”

The General Marshall will join the ranks of Callan Marine’s other dredges: the 32” General MacArthur, the 28” General Bradley, the 18” General Pershing, the 16” General Patton, and the 12” General Eisenhower.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Daily Dredging and Port Construction News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.