DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Operations & Maintenance›Place Matuvu sand used for beach replenishment
Operations & Maintenance

June 29, 2021 · about 5 years ago

Place Matuvu sand used for beach replenishment

Together with Goethals Promotor Jan De Nul’s project developer PSR will revive Place Matuvu in Knokke. The works for this unique square are in full progress and the sand excavated for the construction works appears to be perfect to be used for the beach replenishment works in Knokke. In the autumn o

2 minutes read
  • LinkedIn
  • X
  • Email
Place Matuvu sand used for beach replenishment
Jan De Nul

Together with Goethals Promotor Jan De Nul’s project developer PSR will revive Place Matuvu in Knokke.

The works for this unique square are in full progress and the sand excavated for the construction works appears to be perfect to be used for the beach replenishment works in Knokke.

In the autumn of 2020 the definitive redevelopment works on the “Albertplein” started. In the meantime, the actual excavation and construction works for the construction of the underground garage complex are underway. This is a spectacular sight, because at the moment, there is already a huge construction pit of about 10 metres deep and the floor plate is being poured on level -2.

To arrive at that depth, about 36,000 m³ of sand had to be excavated. Moreover, soil samples showed that the dune sand was of excellent quality, so Jan De Nul chose to reuse it on the beaches near Surfers Paradise and De Lekkerbek in “het Zoute”. This is how JDN protects the coast from the impact of the sea in a natural and therefore sustainable way.

In order to ensure that the beach at Surfers Paradise is comfortable and safe for coastal visitors this summer, Jan De Nul first sieved the excavated sand to remove the stones.

Earlier this year, JDN successfully completed the beach replenishments in Knokke and Raversijde. In total, the company restored 4.5 kilometres of beach length in just a few weeks.

In order to do so, JDN dredged 1,400,000 m³ of sand and nourished the beach in order to raise the coastline and protect it against the force of the sea. The fact that the excavated sand from Place Matuvu can also be used for these beach replenishments completes the circle.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Operations & Maintenance

Daily dredging and port construction news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1EXCLUSIVE: Jan De Nul's TSHD Juan Sebastián de Elcano completes Rio Tinto dredging
  2. 2BREAKING NEWS: Caspian Sea dredging on the way, Baku Port CEO says
  3. 3All set for Hells Gate State Park marina dredging
  4. 4Dredging wraps up at Chaudoirs Dock County Park

Daily dredging and port construction news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free