DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Infrastructure›Preventing erosion of San Gabriel River levee
Infrastructure

June 29, 2021 · about 5 years ago

Preventing erosion of San Gabriel River levee

The U.S. Army Corps of Engineers has prepared a draft environmental assessment for the the San Gabriel River and San Jose Creek Confluence Vegetation and Sediment Removal project, within the County of Los Angeles. To prevent further erosion of the San Gabriel River 2b levee and prevent potential fai

1 minutes read
  • LinkedIn
  • X
  • Email
Preventing erosion of San Gabriel River levee
USACE

The U.S. Army Corps of Engineers has prepared a draft environmental assessment for the the San Gabriel River and San Jose Creek Confluence Vegetation and Sediment Removal project, within the County of Los Angeles.

To prevent further erosion of the San Gabriel River 2b levee and prevent potential failure, the proposed project will consist of removing approximately 127,000 cubic yards of accumulated excess sediment and 11.2 acres of vegetation as part of the operation and maintenance of the channel.

The channel in this reach is trapezoidal and comprised of concrete/grouted stone with an earthen invert.

Sediment will be excavated to the design elevation of the channel invert across the entire width of the channel between the San Gabriel River/San Jose Creek confluence and the Pomona Freeway (SR60).

The maintenance footprint is approximately 17.8 acres. The depth of the sediment ranges from 3 to 10 feet.

No alterations or modifications of structural elements of the engineered channel will occur, said USACE.

Work will begin October 2021.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Infrastructure

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1USACE starts feasibility study for Cooper River deepening
  2. 2BREAKING NEWS: Dutch Dredging takes delivery of new TSHD Magdalena
  3. 3Stockton closes boat launch due to dredging work
  4. 4E-touch Dredgers: Work on new TSHD progresses steadily

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free