DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Operations & Maintenance›Ross River dredging campaign complete
Operations & Maintenance

July 13, 2021 · about 5 years ago

Ross River dredging campaign complete

Pacific Marine Group (PMG) recently completed a dredging campaign in the Ross River for Port of Townsville Limited. The Ross River Channel is the waterway all PMG vessels utilise to exit and enter the dedicated marine facility, and when the channel becomes silted up, the windows of opportunity to en

1 minutes read
  • LinkedIn
  • X
  • Email
Ross River dredging campaign complete
PMG

Pacific Marine Group (PMG) recently completed a dredging campaign in the Ross River for Port of Townsville Limited.

The Ross River Channel is the waterway all PMG vessels utilise to exit and enter the dedicated marine facility, and when the channel becomes silted up, the windows of opportunity to enter and exit the channel become smaller and smaller due to strict underkeel clearance requirements.

For this project, PMG used a spudded 36m x 12m barge (PMG121) fitted with a 40t long arm excavator and sitech 3D control software, to complete the digging task.

The dredge spoil was disposed of on land by first being placed onboard the sidewall fitted 45m x 15m barge PMG150.

The spoil was then moved ashore by the tug PMG Sailfish, for unloading at the barge ramp, and transport to POTL’s reclaim area via Moxi dump trucks. PMG was supported by Wilco Logistics on the project.

Once all the bulk digging was completed, the channel was levelled using the sweep bar system fitted to the tug PMG Tarka.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Operations & Maintenance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1USACE starts feasibility study for Cooper River deepening
  2. 2BREAKING NEWS: Dutch Dredging takes delivery of new TSHD Magdalena
  3. 3Stockton closes boat launch due to dredging work
  4. 4E-touch Dredgers: Work on new TSHD progresses steadily

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free