Advertisement

Infrastructure

about 5 years ago

Makhachkala dredging kicks off

A maintenance dredging program in the operating basin near the construction Berth No. 6 at the Port of Makhachkala is now underway. For this project, FSUE Rosmorport’s Makhachkala regional branch deployed its own excavator – with a boom length of 8.2m – and a dredging pump with cutter head to perfor

1 minutes read
Makhachkala dredging kicks off
Rosmorport

A maintenance dredging program in the operating basin near the construction Berth No. 6 at the Port of Makhachkala is now underway.

For this project, FSUE Rosmorport’s Makhachkala regional branch deployed its own excavator – with a boom length of 8.2m – and a dredging pump with cutter head to perform dredging works directly from the berth.

Rosmorport will to dredge more than 1200 cbm of material to deepen the basin to the -5.5m mark.

According to the company, the dredge material will be transported through a pipeline to the coastal dump at a distance of 150 m.

Dredging works are carried out by the Makhachkala branch in accordance with the approved design documentation for maintenance dredging to keep the design depths of the basin and approach channels of the seaport of Makhachkala for the period 2019-2028.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Daily Dredging and Port Construction News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.