DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Technology›City of Newport Beach seeks permit to construct CAD­ facility
Technology

December 30, 2021 · about 4 years ago

City of Newport Beach seeks permit to construct CAD­ facility

The City of Newport Beach is requesting a permit to construct a Confined Aquatic Disposal facility in the central portion of Lower Newport Bay, the USACE Los Angeles District said. The CAD would provide a location to contain dredged sediment that is unsuitable for open ocean disposal. Clean material

1 minutes read
  • LinkedIn
  • X
  • Email
City of Newport Beach seeks permit to construct CAD­ facility
USACE

The City of Newport Beach is requesting a permit to construct a Confined Aquatic Disposal facility in the central portion of Lower Newport Bay, the USACE Los Angeles District said .

The CAD would provide a location to contain dredged sediment that is unsuitable for open ocean disposal.

Clean material suitable for beach nourishment, generated from constructing the facility, would be transported and placed along the nearshore ocean beaches.

To accommodate the required volumes of expected unsuitable material and sediment capping material, the proposed estimated size of the CAD facility is approximately 590 feet by 590 feet.

“The CAD facility construction activities would cause increases in suspended sediments and turbidity, which would affect foraging species’ ability to see food normally visible in the water,” said USACE.

The CAD Facility has been designed to accommodate 199,500 CY of material.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Technology

Daily Dredging and Port Construction News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Jan De Nul's Galileo Galilei completes São Francisco do Sul dredging
  2. 2Crewing a dredger: Why dredge masters and TSHD engineers are the hardest seats to fill
  3. 3PHOTO OF THE DAY: Spotlight on Damen electric CSD AMORIS
  4. 4FRPD, Van Oord keep Fraser River navigable

Daily Dredging and Port Construction News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free