DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Equipment›Manor Marine to build dredge support Multicat
Equipment

April 18, 2022 · about 4 years ago

Manor Marine to build dredge support Multicat

Manor Marine has just introduced a plan for building a 20 metre Multicat vessel, suitable for a range of applications. Construction will be undertaken at the fabrication and engineering facility in Portland, Dorset. Focused on the offshore renewables industry, the vessel is designed for multi-purpos

1 minutes read
  • LinkedIn
  • X
  • Email
Manor Marine to build dredge support Multicat
Manor

Manor Marine has just introduced a plan for building a 20 metre Multicat vessel, suitable for a range of applications.

Construction will be undertaken at the fabrication and engineering facility in Portland, Dorset.

Focused on the offshore renewables industry, the vessel is designed for multi-purpose uses. The vessel will be suitable for dredge support, subsea cable support, towage, buoyage maintenance, marine civil engineering and dive support.

Construction is due to start in June 2022, said the company.

Constructed using all welded steel, the Multicat will be of single chine construction and will feature a fully fitted out wheelhouse, deck cargo carrying capacity of 20 tonnes, estimated bollard pull of 12 tonnes and a working deck area totalling 70m2.

An Effer 850.8 deck crane will be installed with a lifting capacity of 2.4 tonnes at 20 metres.

At 20 metres in length, the vessel will have an approximate maximum speed of 10 knots, achieved with two Volvo Penta D13-MH marine propulsion engines; the vessel will be suitable for operation in coastal waters (up to 20 miles from the shore) and the craft will be built in accordance with Lloyd’s Register Regulations and to MCA Workboat Code CAT 2.

The Multicat is scheduled to be completed in early 2023 and will held as stock upon delivery.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

EquipmentResearch & DevelopmentTechnology

Daily Dredging and Port Construction News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Boskalis, Van Oord gear up for Sweden's largest-ever dredging project
  2. 2USACE modernizes national dredging delivery through enterprise execution
  3. 3Dredging plan for Cedar River Harbor on the table
  4. 4BREAKING NEWS: Keyfield takes delivery of TSHD Inai Kenanga

Daily Dredging and Port Construction News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free