DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Authorities & Government›Cowlitz River project available for public review
Authorities & Government

September 29, 2022 · about 3 years ago

Cowlitz River project available for public review

The U.S. Army Corps of Engineers, Portland District is proposing to perform advance maintenance dredging at the mouth of the Cowlitz River near Longview, Washington. As disclosed, USACE plans to perform advance maintenance dredging and to establish a sediment trap at the mouth of the Cowlitz River.

1 minutes read
  • LinkedIn
  • X
  • Email
Cowlitz River project available for public review
J.E. McAmis

The U.S. Army Corps of Engineers, Portland District is proposing to perform advance maintenance dredging at the mouth of the Cowlitz River near Longview, Washington.

As disclosed, USACE plans to perform advance maintenance dredging and to establish a sediment trap at the mouth of the Cowlitz River. The work would occur over two construction seasons, November 1, 2022 to January 31, 2023 and November 1, 2023 to January 31, 2024.

The purpose of the dredging is to facilitate navigation and reduce risk to river users and provide reliable passage of commercial and recreational traffic by removing shoals that restrict the movement of vessels.

The need for the advance maintenance dredging is to address increased dredging/re-dredging frequency following increased Mt. St. Helens volcanic sediment flows down the Cowlitz River.

The shoaling in-fill rate from Cowlitz River sediment has reached an unmanageable frequency in the Lower Columbia River Federal Navigation Channel at river mile 68 and additional dredging is needed to maintain the authorized channel depth between dredging events.

The deadline for sending comments on the proposed work is October 14, 2022.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Authorities & Government

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1USACE starts feasibility study for Cooper River deepening
  2. 2BREAKING NEWS: Dutch Dredging takes delivery of new TSHD Magdalena
  3. 3Stockton closes boat launch due to dredging work
  4. 4E-touch Dredgers: Work on new TSHD progresses steadily

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free