DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Infrastructure›Finalising design requirements for Wamberal Beach terminal protection structures
Infrastructure

October 10, 2022 · about 3 years ago

Finalising design requirements for Wamberal Beach terminal protection structures

The Wamberal Beach Terminal Protection Structure Engineering Design Requirements, which outlines minimum engineering specifications and details for coastal erosion protection works in the Wamberal embayment, has been finalised and adopted following a review of 247 formal submissions received during

2 minutes read
  • LinkedIn
  • X
  • Email
Finalising design requirements for Wamberal Beach terminal protection structures
centralcoast.nsw.gov.au

The Wamberal Beach Terminal Protection Structure Engineering Design Requirements, which outlines minimum engineering specifications and details for coastal erosion protection works in the Wamberal embayment, has been finalised and adopted following a review of 247 formal submissions received during recent community consultation on the draft document.

Council’s Director of Environment and Planning, Alice Howe , said that this decision is a science-based outcome responding to independent evidence and designed to give residents the ability to protect their property whilst maintaining public amenity and enjoyment of the beach.

“These minimum engineering requirements support a whole-of-embayment solution based on extensive technical studies and input from the community. The solution maximises both the amenity of the public beach and provides clear guidance to landowners on their responsibilities,” Dr Howe said.

Council Administrator, Rik Hart , said that community consultation has been an integral part of the process throughout the various stages of expert investigations and studies to identify long-term solutions to coastal erosion at Wamberal.

“I acknowledge that there are many in the community that remain opposed to a terminal protection structure as an option, and it was a consistent theme raised throughout all engagement phases,” Hart said.

“However, it is important to note that the Coastal Zone Management Study 2015 , which informed the adopted Gosford Beaches Coastal Zone Management Plan 2017, considered all feasible management options to address current and future coastal risks to the environmental planning and management of the area – including mass sand nourishment, artificial reefs and planned retreat,” he added.

“There have been multiple opportunities for consultation over the various stages of this multi-year project, with community feedback playing a tangible role in finalising the minimal engineering design requirements.”

The adopted Wamberal Beach Terminal Protection Structure Engineering Design Requirements will now be used in conjunction with relevant NSW legislation and policy to assess future development applications.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Infrastructure

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1USACE starts feasibility study for Cooper River deepening
  2. 2BREAKING NEWS: Dutch Dredging takes delivery of new TSHD Magdalena
  3. 3Stockton closes boat launch due to dredging work
  4. 4E-touch Dredgers: Work on new TSHD progresses steadily

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free