DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Infrastructure›ZPMC cuts steel for China’s first LNG-powered hopper dredger
Infrastructure

December 28, 2022 · about 3 years ago

ZPMC cuts steel for China’s first LNG-powered hopper dredger

Shanghai Zhenhua Heavy Industry Co., Ltd. (ZPMC) has successfully held a steel cutting ceremony for the China’s first LNG-powered Trailing Suction Hopper Dredger. According to the shipbuilder, the ceremony was held at ZPMC Qidong Offshore Engineering yard on December 26. Ordered by CCCC Shanghai Dre

1 minutes read
  • LinkedIn
  • X
  • Email
ZPMC cuts steel for China’s first LNG-powered hopper dredger
ZPMC

Shanghai Zhenhua Heavy Industry Co., Ltd. (ZPMC) has successfully held a steel cutting ceremony for the China’s first LNG-powered Trailing Suction Hopper Dredger.

According to the shipbuilder, the ceremony was held at ZPMC Qidong Offshore Engineering yard on December 26.

Ordered by CCCC Shanghai Dredging and designed by Marine Design and Research Institute of China, the new dredger will have a total length of 155,7 meters, width of 32 meters and a draft of 9,9 meters.

“The vessel is the first extra-large clean energy-powered Trailing Suction Hopper Dredger with completely independent design solutions in China,” the company said in a statement. “The newbuild is intelligent and eco-friendly, and its technology related to LNG power fills the gap of clean energy power for dredging ships in China.”

ZPMC also added that with the hopper capacity of the 15,000m³ the new dredger will reduce emission of nitrogen oxides by up to 90%, carbon dioxide emissions up to 20% and eliminate sulfur oxides and particulate matter emissions.

The shipbuilder expects the new vessel to be completed and ready for delivery by the end of 2023.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

InfrastructureVessels

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1USACE starts feasibility study for Cooper River deepening
  2. 2BREAKING NEWS: Dutch Dredging takes delivery of new TSHD Magdalena
  3. 3Stockton closes boat launch due to dredging work
  4. 4E-touch Dredgers: Work on new TSHD progresses steadily

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free