Advertisement

Operations & Maintenance

about 3 years ago

Boskalis’ Manu Pekka ready to dredge River Dee in Aberdeen

Port of Aberdeen recently contracted Boskalis Westminster to conduct emergency maintenance dredging works in the River Dee. Flooding in November 2022 caused significant material to accumulate in the west of the river resulting in the minimum water depths being exceeded at the port’s Torry 6 and Mear

1 minutes read
Boskalis’ Manu Pekka ready to dredge River Dee in Aberdeen
Boskalis

Port of Aberdeen recently contracted Boskalis Westminster to conduct emergency maintenance dredging works in the River Dee.

Flooding in November 2022 caused significant material to accumulate in the west of the river resulting in the minimum water depths being exceeded at the port’s Torry 6 and Mearns 3 berths. The berths have been out of normal operation since the flooding.

According to the Port, the backhoe dredger ‘Manu Pekka’ is expected to commence dredging today, February 9, for approximately five days.

A similar workscope was complete in 2016 following Storm Frank.

Stakeholders including Marine Scotland and Dee District Salmon Fisheries Board have been consulted on the planned dredge.

Port of Aberdeen and Boskalis Westminster said that they are focused on completing the workscope safely, efficiently and with minimum impact on the local environment.

Advertisement

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Daily Dredging and Port Construction News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.