DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Vessels›Lotos Shipyard launches new dredger for GTLK
Vessels

June 30, 2023 · about 3 years ago

Lotos Shipyard launches new dredger for GTLK

Lotos Shipyard of USC’s Southern Centre for Shipbuilding and Ship Repair yesterday launched the second self-propelled dredger in the series of four ships of Project 93.159. The vessels, which are ordered by the State Transport Leasing Company (GTLK), are intended to debottleneck inland waterways and

1 minutes read
  • LinkedIn
  • X
  • Email
Lotos Shipyard launches new dredger for GTLK
Photo courtesy of the Astrakhan Region Government

Share this article

Lotos Shipyard of USC’s Southern Centre for Shipbuilding and Ship Repair yesterday launched the second self-propelled dredger in the series of four ships of Project 93.159.

The vessels, which are ordered by the State Transport Leasing Company (GTLK), are intended to debottleneck inland waterways and increase their throughput capacity.

According to the shipbuilder, the lead dredger of the series named Lotos-1 is currently undergoing mooring trials and will be delivered to the customer next month.

Key particulars of the Project 93.159 are: LOA – 50.00m; breadth – 11.88m; depth – 2.97m; average draft (fully fueled) – 1.30m; dredging depth (max) – 10m; dredging depth (min) – 2.0m; capacity – 900 cbm/hour.

Earlier this month, GTLK and the Southern Centre for Shipbuilding and Ship Repair signed a contract for the construction of six self-propelled dredgers with interchangeable cutter suction / rotary bucket equipment (Project 93.159А). The dredgers are to be built at Lotos production facilities. The first three vessels are scheduled for delivery in 2025 and the second batch in 2026.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Vessels

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1USACE starts feasibility study for Cooper River deepening
  2. 2BREAKING NEWS: Dutch Dredging takes delivery of new TSHD Magdalena
  3. 3Stockton closes boat launch due to dredging work
  4. 4E-touch Dredgers: Work on new TSHD progresses steadily

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free