Advertisement

Infrastructure

about 3 years ago

McCarthy wraps up largest public port project on Texas coast

McCarthy Building Companies, Inc. has completed construction of Berth 8 at Port Freeport, Texas. Part of the Velasco Terminal, Berth 8 features over 925 feet of berth and an associated roll-on/roll-off dock extension. The expansion represents the single largest project built by a public port on the

1 minutes read
McCarthy wraps up largest public port project on Texas coast
Photo courtesy of McCarthy Building Companies, Inc.

Share this article

McCarthy Building Companies, Inc. has completed construction of Berth 8 at Port Freeport, Texas.

Part of the Velasco Terminal, Berth 8 features over 925 feet of berth and an associated roll-on/roll-off dock extension.

The expansion represents the single largest project built by a public port on the Texas Gulf Coast.

The scope of work included demolition of an existing concrete relieving platform, dry excavation, combi-wall bulkhead installation, construction of the new wharf which included wharf piling, mechanical and hydraulic dredging, mudline/shoreline protection system, and mooring and breasting system, plus the rehabilitation of the existing Berth 7 fender system.

McCarthy self-performed all aspects of the project except for hydraulic dredging, electrical and crane rail installation.

Advertisement

Berth 8 was dredged to minus 51 feet, matching the depth of the Freeport Harbor Channel Improvement Project. This allows it to handle newer, larger container vessels transiting the expanded Panama Canal.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Daily Dredging and Port Construction News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.