DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Infrastructure›McCarthy wraps up largest public port project on Texas coast
Infrastructure

June 30, 2023 · about 3 years ago

McCarthy wraps up largest public port project on Texas coast

McCarthy Building Companies, Inc. has completed construction of Berth 8 at Port Freeport, Texas. Part of the Velasco Terminal, Berth 8 features over 925 feet of berth and an associated roll-on/roll-off dock extension. The expansion represents the single largest project built by a public port on the

1 minutes read
  • LinkedIn
  • X
  • Email
McCarthy wraps up largest public port project on Texas coast
Photo courtesy of McCarthy Building Companies, Inc.

Share this article

McCarthy Building Companies, Inc. has completed construction of Berth 8 at Port Freeport, Texas.

Part of the Velasco Terminal, Berth 8 features over 925 feet of berth and an associated roll-on/roll-off dock extension.

The expansion represents the single largest project built by a public port on the Texas Gulf Coast.

The scope of work included demolition of an existing concrete relieving platform, dry excavation, combi-wall bulkhead installation, construction of the new wharf which included wharf piling, mechanical and hydraulic dredging, mudline/shoreline protection system, and mooring and breasting system, plus the rehabilitation of the existing Berth 7 fender system.

McCarthy self-performed all aspects of the project except for hydraulic dredging, electrical and crane rail installation.

Berth 8 was dredged to minus 51 feet, matching the depth of the Freeport Harbor Channel Improvement Project. This allows it to handle newer, larger container vessels transiting the expanded Panama Canal.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

InfrastructurePorts & Logistics

Daily Dredging and Port Construction News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1PHOTO OF THE DAY: Swiss Army Knife of Great Lakes in Ashtabula
  2. 2Puerto de Sevilla completes Guadalquivir dredging
  3. 3McLaughlin & Harvey appointed to Dover' Project Contractor Framework
  4. 4Oceanside Harbor dredging wraps up

Daily Dredging and Port Construction News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free