Advertisement

Infrastructure

about 3 years ago

Sandusky Bay dredging starts next week

The U.S. Army Corps of Engineers said that the dredging activities in the Sandusky Bay are scheduled to begin during the next week. They will be laying a pipeline on the lakebed to carry the dredged material to the placement site at the wetlands area off the Cedar Point Causeway. The pipeline area w

1 minutes read
Sandusky Bay dredging starts next week

Share this article

The U.S. Army Corps of Engineers said that the dredging activities in the Sandusky Bay are scheduled to begin during the next week.

They will be laying a pipeline on the lakebed to carry the dredged material to the placement site at the wetlands area off the Cedar Point Causeway.

The pipeline area will be marked by orange buoys every 500 feet, said the City of Sandusky.

The bay is not naturally deep enough for freighters to travel through its waters.

In order to allow for shipping, USACE dredges out material from the base of the bay along shipping channels so freighters can reach the coal docks.

Advertisement

The dredged material is then pumped to the new wetlands facility for safe storage and to create new bio-friendly wetlands.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Daily Dredging and Port Construction News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.