Advertisement

Dredging

about 2 years ago

Portsmouth Harbor dredging complete

The U.S. Army Corps of Engineers, New England District and Cashman Dredging & Marine Contracting have officially wrapped up maintenance dredging contract in Portsmouth Harbor, NH. The authorized Federal Navigation Project (FNP) for Portsmouth Harbor consists of five 35-feet-deep segments along the P

1 minutes read
Portsmouth Harbor dredging complete
Photo courtesy of Cashman Dredging

Share this article

The U.S. Army Corps of Engineers, New England District and Cashman Dredging & Marine Contracting have officially wrapped up maintenance dredging contract in Portsmouth Harbor , NH.

The authorized Federal Navigation Project (FNP) for Portsmouth Harbor consists of five 35-feet-deep segments along the Piscataqua River referred to as the New Castle Reach, Seavey Island Reach, Portsmouth Reach, Boiling Rock Reach, and the Newington Reach with a 35-foot-deep turning basin following the Newington Reach.

The work of this project within the FNP included advanced maintenance dredging of two shoaled areas within the Newington Reach to achieve the specified required depths and the in-river placement of dredged material at the designated in-river dredged material placement site within the Piscataqua River.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Daily Dredging and Port Construction News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.