Advertisement

Dredging

about 2 years ago

Dredging underway at Clinton Town Marina

Work is underway on the Clinton Town Marina Dredging and Boat Ramp Replacement Project in Connecticut. The dredging of the marina is one year behind schedule. Usually, dredging occurs on a five to seven-year cycle depending upon a variety of factors. As a result, approximately 25% of the slips are n

1 minutes read
Dredging underway at Clinton Town Marina
Photo courtesy of the Town of Clinton

Share this article

Work is underway on the Clinton Town Marina Dredging and Boat Ramp Replacement Project in Connecticut.

The dredging of the marina is one year behind schedule. Usually, dredging occurs on a five to seven-year cycle depending upon a variety of factors.

As a result, approximately 25% of the slips are now either out of the water or the water level is so low the slips can’t be rented or must be rented at a reduced rate.

The Town Marina located on Riverside Drive provides the residents of Clinton with direct access to the harbor.

The Marina is staffed and maintained by the Town and has undergone several major projects in the past ten years including a new bulkhead and deck improvements.

Advertisement

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Daily Dredging and Port Construction News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.