DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Dredging›JDN hopper barges docked at the BLRT Repair Yards
Dredging

July 15, 2024 · about 2 years ago

JDN hopper barges docked at the BLRT Repair Yards

Split hopper barges MAGELLANO 1800, VERRAZZANO 1800, BOUSSOLE and L’AIGLE are currently undergoing service by the BLRT REPAIR YARDS in Klaipėda, Lithuania. The four barges, owned by Jan De Nul Group, a family-owned company specializing in the construction and maintenance of marine infrastructure, ar

1 minutes read
  • LinkedIn
  • X
  • Email
JDN hopper barges docked at the BLRT Repair Yards

Share this article

Split hopper barges MAGELLANO 1800, VERRAZZANO 1800, BOUSSOLE and L’AIGLE are currently undergoing service by the BLRT REPAIR YARDS in Klaipėda, Lithuania.

The four barges, owned by Jan De Nul Group, a family-owned company specializing in the construction and maintenance of marine infrastructure, are actively fulfilling vital missions in modern ports and oceans today.

The two smaller barges measure approximately 80 meters in length, 14.5 meters in width, and have a capacity of 2000 cubic meters each. The other two barges are nearly 100 meters in length, 19 meters in width, and boast a capacity of 3700 cubic meters each.

The scope of work includes, but is not limited to replacing the rubber sealing elements installed between the ship semi-hulls, hull cleaning, painting, and replacing pipes and hull steel constructions.

Notably, for BOUSSOLE, in addition to standard drydocking works, one of the two split cylinders, weighing approximately 32 tons, was replaced.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

DredgingVessels

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1USACE starts feasibility study for Cooper River deepening
  2. 2BREAKING NEWS: Dutch Dredging takes delivery of new TSHD Magdalena
  3. 3Stockton closes boat launch due to dredging work
  4. 4E-touch Dredgers: Work on new TSHD progresses steadily

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free