Advertisement

Beach Nourishment

about 2 years ago

City of Gold Coast: Annual sand dredging underway

The City of Gold Coast is conducting annual sand dredging to raise the sandbank by a meter. According to the City, the work will take about four weeks, weather permitting. Beach nourishment is an integral part of their coastal protection efforts. It includes: Increased volumes of sand help to protec

1 minutes read
City of Gold Coast: Annual sand dredging underway
photo courtesy of Councillor Joe Wilkinson fb

The City of Gold Coast is conducting annual sand dredging to raise the sandbank by a meter.

According to the City, the work will take about four weeks, weather permitting.

Beach nourishment is an integral part of their coastal protection efforts. It includes:

Increased volumes of sand help to protect private and public property along the coastline, and wider dunes and beaches means storm impacts are more manageable.

The first sand bypassing system was constructed at the Gold Coast Seaway in 1986. The aim was to maintain the natural movement of sand along the coastline.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Daily Dredging and Port Construction News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.