Advertisement

Dredging

about 2 years ago

Port of Kangerlussuaq dredging program wrapped up for this year

Sikuki Nuuk Harbor has successfully completed dredging of the Port of Kangerlussuaq shipping channel. The 2024 dredging campaign, carried out by Polar Dive on behalf of the Government of Greenland, will significantly increase docking opportunities for all harbor users as early as the start of the 20

1 minutes read
Port of Kangerlussuaq dredging program wrapped up for this year
Photo courtesy of Polar Dive

Share this article

Sikuki Nuuk Harbor has successfully completed dredging of the Port of Kangerlussuaq shipping channel.

The 2024 dredging campaign, carried out by Polar Dive on behalf of the Government of Greenland, will significantly increase docking opportunities for all harbor users as early as the start of the 2025 docking season.

This year’s dredging included the shipping channel, which has now been widened to 24 meters and deepened to between 3.5 and 5m MV.

In addition, the entire harbor basin and a larger area west of the harbor have been dredged to 5 meters. This effort has resulted in the channel being fully navigable again, and smaller vessels can now dock at the quay.

The final phase of dredging will be completed in 2025, and operations are expected to resume as soon as possible after the winter. This will include widening the channel to a total width of 38 meters and a minimum depth of 4.5m.

Advertisement

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Daily Dredging and Port Construction News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.