DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Dredging›Lower Columbia River Dredged Material Management Plan
Dredging

October 29, 2024 · about 1 year ago

Lower Columbia River Dredged Material Management Plan

The U.S. Army Corps of Engineers, Portland District has released public notice of proposed discharges of dredged and fill material for the Lower Columbia River Channel Maintenance works. According to the notice, USACE proposes to discharge dredged and fill material during implementation of a Dredged

1 minutes read
  • LinkedIn
  • X
  • Email
Lower Columbia River Dredged Material Management Plan
Photo courtesy of USACE

Share this article

The U.S. Army Corps of Engineers, Portland District has released public notice of proposed discharges of dredged and fill material for the Lower Columbia River Channel Maintenance works.

According to the notice, USACE proposes to discharge dredged and fill material during implementation of a Dredged Material Management Plan and integrated Environmental Impact Statement (DMMP-EIS) for the purpose of maintaining the congressionally authorized channel dimensions of the Lower Columbia River (LCR) Federal Navigation Channel (FNC), part of the Columbia and Lower Willamette Rivers (C&LW) Project.

LCR FNC maintenance dredging would occur annually utilizing a variety of dredge equipment. The intent of maintenance dredging is to reduce impediments to navigation by dredging to authorized dimensions, plus advanced maintenance dredging (AMD).

The overall purpose of the DMMP-EIS is to define the dredged material management practices for the LCR FNC to maintain the authorized dimensions for a minimum of 20 years.

The forecasted average volume of material needed to be dredged to maintain the authorized dimensions for the next 20 years is expected to be 9.2 million cubic yards annually. The channel is typically maintained using hydraulic (hopper and pipeline) dredges but mechanical dredges with material placement barges can also be used.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Dredging

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1USACE starts feasibility study for Cooper River deepening
  2. 2BREAKING NEWS: Dutch Dredging takes delivery of new TSHD Magdalena
  3. 3Stockton closes boat launch due to dredging work
  4. 4E-touch Dredgers: Work on new TSHD progresses steadily

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free