DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Dredging›VPA proposes dredging of the Elizabeth River
Dredging

October 29, 2024 · about 1 year ago

VPA proposes dredging of the Elizabeth River

Virginia Port Authority (VPA) has announced plans to perform maintenance dredging of its facilities on the Elizabeth River, the Norfolk International Terminal-North (NNIT) and Norfolk International Terminal-South (SNIT). The deepening and widening of the approach channel and berthing areas is aimed

1 minutes read
  • LinkedIn
  • X
  • Email
VPA proposes dredging of the Elizabeth River
Photo courtesy of USACE

Share this article

Virginia Port Authority (VPA) has announced plans to perform maintenance dredging of its facilities on the Elizabeth River, the Norfolk International Terminal-North (NNIT) and Norfolk International Terminal-South (SNIT).

The deepening and widening of the approach channel and berthing areas is aimed to provide safe navigation for the Ultra Large Container Vessels.

The proposed project includes dredging of the entire area from previously permitted -52 ft MLLW to a new maximum depth of -58 ft MLLW.

Also, the project calls for new dredging to widen the NNIT approach channel on both the North (1.70 acres) and the South (4.80 acres) of the approach channel to a maximum depth of -58 ft MLLW.

VPA estimates that approximately 5.35 million cubic yards of material will be removed from the 234.27 acre NIT site (North and South) during the 10-year maintenance cycle with approximately 3.35 million cubic yards of dredged material removed initially and 1.0 million cubic yards of dredged material removed per 5 year maintenance cycle.

More Info

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

DredgingPermitting

Daily dredging and port construction news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1BREAKING NEWS: Boskalis and Van Oord begin IJsselmeerdijk project
  2. 2USACE completes West Harbor dredging project
  3. 3EXCLUSIVE: GRSE, Damen sign MoU on construction of advanced dredgers
  4. 4Lyttelton Port gears up for its largest expansion project

Daily dredging and port construction news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free