Advertisement

Dredging

about 2 years ago

VIDEO: Dredging wraps up at Honolulu Harbor

Maintenance dredging at the Honolulu Harbor is now complete. It took two months and a total of 10,533 cubic yards of material was removed. The dredge material was taken to a dewatering site at Kalaeloa to dry out before it will be hauled to a landfill. Honolulu Harbor is the principal seaport of the

1 minutes read
VIDEO: Dredging wraps up at Honolulu Harbor
photo courtesy of USACE

Maintenance dredging at the Honolulu Harbor is now complete. It took two months and a total of 10,533 cubic yards of material was removed.

The dredge material was taken to a dewatering site at Kalaeloa to dry out before it will be hauled to a landfill.

Honolulu Harbor is the principal seaport of the State of Hawaii.

Hawaii receives more than 98% of all goods through its harbors.

Much of the containerized items are first shipped into Honolulu Harbor, then separated and trans-shipped to the neighbor islands.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Daily Dredging and Port Construction News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.