Advertisement

Dredging

about 2 years ago

Van Oord kicks off Port of Santos dredging campaign

This week, the Port Authority of Santos (APS) kicked off new maintenance dredging campaign for the Port of Santos. The port is located in an estuary that receives a significant volume of sediment, which can cause silting and reduce the established depth of the waterway. Therefore, dredging in Santos

1 minutes read
Van Oord kicks off Port of Santos dredging campaign
Photo courtesy of APA

Share this article

This week, the Port Authority of Santos (APS) kicked off new maintenance dredging campaign for the Port of Santos.

The port is located in an estuary that receives a significant volume of sediment, which can cause silting and reduce the established depth of the waterway. Therefore, dredging in Santos is permanently necessary to maintain the depth of the complex.

The dredging is being carried out by Van Oord’s trailing suction hopper dredger Utrecht. This includes removing sediment along the channel bottom to maintain a depth of 15 meters.

The area of ​​operation covers the sections of the navigation channel from Barra to Alemoa, with the removed sediments to be deposited at the offshore disposal site.

According to APA, the dredging operations will continue until January 2025.

Advertisement

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Daily Dredging and Port Construction News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.