Advertisement

Breakwater Construction

about 1 year ago

Acciona wins Ravenna breakwater deal

Acciona, in a consortium with the Italian company RCM Construzioni, has won a contract to build a breakwater to shelter the new floating terminal for industrial use at the Port of Ravenna. The breakwater, which has a tender budget of €216 million, will consist of a vertical dock, built with concrete

1 minutes read
Acciona wins Ravenna breakwater deal
photo courtesy of Acciona

Acciona, in a consortium with the Italian company RCM Construzioni, has won a contract to build a breakwater to shelter the new floating terminal for industrial use at the Port of Ravenna.

The breakwater, which has a tender budget of €216 million, will consist of a vertical dock, built with concrete caissons. It will be 880 meters long and 22 meters wide.

The infrastructure is set to be located 8.5 kilometers from the coastline off Punta Marina, south of the Port of Ravenna, in the North Adriatic Sea, and has a completion deadline in 24 months.

According to Acciona, the Port Authority of the North-Central Adriatic Sea will finance the works through a loan granted by Cassa Depositi e Prestiti, one of Italy’s leading development banks.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Daily Dredging and Port Construction News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.