DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Authorities & Government›CPRA breaks ground on the Maurepas Swamp Project
Authorities & Government

December 3, 2024 · about 1 year ago

CPRA breaks ground on the Maurepas Swamp Project

The Louisiana Coastal Protection and Restoration Authority (CPRA) yesterday joined its partners from the U.S. Army Corps of Engineers, the Gulf Coast Ecosystem Restoration Council, the Pontchartrain Levee District, and St. John the Baptist, St. James, and St. Charles Parishes to break ground on the

1 minutes read
  • LinkedIn
  • X
  • Email
CPRA breaks ground on the Maurepas Swamp Project

Share this article

The Louisiana Coastal Protection and Restoration Authority (CPRA) yesterday joined its partners from the U.S. Army Corps of Engineers, the Gulf Coast Ecosystem Restoration Council, the Pontchartrain Levee District, and St. John the Baptist, St. James, and St. Charles Parishes to break ground on the River Reintroduction into Maurepas Swamp Project (MSP).

Levees along the river, which provide flood protection to the communities, have disconnected the river from the Maurepas Swamp, depleting the swamp’s need for freshwater nutrients.

The MSP is a 2,000 cubic feet per second freshwater diversion located on the East Bank of the Mississippi River in St. John the Baptist Parish, just west of Garyville, La.

The project will reconnect the Mississippi River to the Maurepas Swamp and revitalize over 45,000 acres with freshwater, sediment and nutrients to nourish one of Louisiana’s largest and last remaining coastal freshwater swamps.

The project involves constructing a headworks structure consisting of three 10’x10’ box culverts in the Mississippi River Levee. These culverts will connect to a newly built two-mile-long conveyance channel, which will flow into the existing Hope Canal.

For the final 3.5 miles, the canal will be enhanced with small earthen levees, guiding water into the Maurepas Swamp outfall area, located just north of I-10.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Authorities & Government

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1BREAKING NEWS: Dutch Dredging takes delivery of new TSHD Magdalena
  2. 2Stockton closes boat launch due to dredging work
  3. 3E-touch Dredgers: Work on new TSHD progresses steadily
  4. 4USACE begins Lower Charleston Harbor maintenance dredging

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free