DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Dredging›Progress continues in Cotuit Channel
Dredging

December 3, 2024 · about 1 year ago

Progress continues in Cotuit Channel

The Barnstable County (MA) dredge Sand Shifter continues to make steady progress on the Cotuit Channel dredging project. Since the November 5th update, dredging has continued in Area 3. Despite the recent weather and mechanical delays, the crews are now halfway through this area. As the work moved f

2 minutes read
  • LinkedIn
  • X
  • Email
Progress continues in Cotuit Channel

Share this article

The Barnstable County (MA) dredge Sand Shifter continues to make steady progress on the Cotuit Channel dredging project.

Since the November 5th update, dredging has continued in Area 3. Despite the recent weather and mechanical delays, the crews are now halfway through this area.

As the work moved further south, additional lengths of pipe had to be added bringing the total length to ~11,300 feet.

Mechanical & Weather Delays

Last week’s mechanical breakdown has been a reoccurring problem with the Sand Shifter. An electronic device that controls the shifting of the transmission failed and the backup valve that can be used to mechanically put the engine in and out of gear was not functioning (due to lack of use).

A replacement valve was ordered but unfortunately it was shipped via UPS Ground not UPS Next Day Air as planned. This delayed the installation of the part until November 26. The Sand Shifter was back out dredging tomorrow morning (Nov. 27).

A total of three dredging days were lost due to this delay with another six days lost due to weather/seas since starting this area.

One a positive note, the crews needed to replace the cutterhead on the dredge as it was heavily worn and wasn’t “cutting” as it should have been.

Attempts to remove the cutterhead were unsuccessful but Plan B was to weld on ‘teeth’ onto the blades. This work was done on Friday, November 22. This is expected to greatly increase the dredging efficiency.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Dredging

Daily Dredging and Port Construction News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1USACE modernizes national dredging delivery through enterprise execution
  2. 2Dredging plan for Cedar River Harbor on the table
  3. 3BREAKING NEWS: Keyfield takes delivery of TSHD Inai Kenanga
  4. 4Work progresses on Grand Isle breakwaters

Daily Dredging and Port Construction News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free